Self-employed buyers who purchase a renovation project should line up the building contract, the drawdown plan and the income evidence before they sign anything. Delays can often arise when the building contract, drawdown plan or income evidence is incomplete when the lender starts its assessment.
This article walks through the mistakes we see most often with a house renovation loan, and how to plan around them.
Can a Construction Loan Fund a Renovation Project?
A construction loan can fund a renovation when the work is large enough to need a building contract, plans and council approval where required. Lenders decide for themselves which projects qualify, so the scope of work matters from the start.
A light cosmetic refresh is usually handled differently, often through a top-up or a home loan with extra funds. A major extension, a structural rebuild or a full gut renovation is more likely to suit a building loan paid in stages. Our construction loans page outlines how we compare options from a panel of lenders.
The trade-off is more paperwork. A construction loan involves plans, a contract, staged payments and inspections, and that takes more coordination than a standard purchase loan.
Mistake One: Signing Before You Have a Fixed Price Building Contract
Lenders generally assess a construction loan against a building contract and plans, so buying the property before you have a quote locked in leaves your borrowing exposed. A fixed price building contract gives the lender a clear cost to fund and gives you a number to budget against.
The contract also sets your deposit to the builder. In Victoria, the Domestic Building Contracts Act 1995 limits the deposit to 5 per cent for contracts of $20,000 or more. Consumer Affairs Victoria advises that the deposit should not be paid until the builder provides a certificate of currency for the property.
A cost plus contract can leave the final price open, which makes it harder to size the loan amount. If you are leaning that way, discuss it with your broker before you commit.
Ready to get started?
Request a Call Back with a Finance & Mortgage Broker at Trusti Lending today.
How Does Progressive Drawdown Work on a Renovation Loan?
With a progressive drawdown, the lender releases the loan in stages as each part of the work is completed, rather than in one lump sum. Interest during the build is usually charged on the amount drawn, but repayment type and timing are set by each lender, so confirm them in writing.
Consider a self-employed builder-supervised renovation where the buyer has a $240,000 building contract and a construction draw schedule tied to base, frame, lock-up and fixing. After the first two draws, $90,000 of the building funds has been released. At the illustrative rate of 6.75% p.a., interest-only on that $90,000 is $6,075 a year, or about $506 a month. That sits on top of the repayments for the purchase portion of the loan.
Because the buyer mapped this out before settlement, they set aside a buffer for the months when draws increased. As later draws are released, the monthly interest rises with them, and the borrower was not surprised by it. You can test your own figures with our loan repayment calculator.
The trade-off is cost and admin. Lenders may charge a progressive drawing fee for each release and may require a progress inspection before paying. Fees and the number of draws differ between lenders, so ask for them in writing.
Self-Employed Income and Your Construction Loan Application
Self-employed borrowers should expect the lender to look closely at income evidence, and what it asks for varies between lenders. Having your business and personal financials organised before applying reduces the chance of a stalled assessment.
Banks regulated by APRA must test whether a new borrower can meet repayments at an interest rate at least 3.0 percentage points above the loan rate. Non-bank lenders are not subject to APRA's rules, so their policies can differ. Different policies can mean different outcomes, but they may also come with different pricing or terms, so the comparison needs to cover more than approval.
APRA's debt-to-income limit applies to a lender's new lending portfolio, not as a test on each borrower. It exempts finance for the construction of new dwellings, the purchase of newly erected dwellings and owner-occupier bridging finance. It does not exempt the purchase of an established property or renovation work on it, so a renovation purchase should be assumed to count towards the limit. Serviceability is assessed regardless. Start with our borrowing power calculator to get a rough view before you speak with us.
If you also run business debt, such as equipment finance, your broker will need to include those repayments in the picture.
Paying the Builder Early: A Costly Victorian Mistake
In Victoria, you should pay the builder for completed stages only, because paying ahead of the work can leave you without insurance cover for that money. Consumer Affairs Victoria notes that insurance may not cover work paid for before it is completed.
Under the current rules, payments follow completed stages. For a contract covering all stages, the usual schedule is 10 per cent at base, 15 per cent at frame, 35 per cent at lock-up and 25 per cent at fixing. A different schedule requires legal advice, and your lender's draw schedule needs to line up with whatever your contract says. A mismatch can leave you short of funds to pay the builder's progress claim on time.
The rules are due to change. The Domestic Building Contracts Amendment Act 2025 (Vic) lets deposit limits and progress payment stages be set by regulation, and its commencement was deferred to 31 March 2027. The Domestic Building Contracts Amendment Regulations 2026 have been made and are due to commence on 31 March 2027. The Act and regulations are expected to apply to contracts entered into on or after commencement, so confirm with your builder and a legal adviser which rules apply to your contract.
Choosing a Registered Builder and Checking the Paperwork
A registered builder with a clear contract, plans and permits makes the lender's valuation and approval process more straightforward to complete. Missing council approval or incomplete plans can delay a loan.
Before you sign, confirm that your builder is registered, that the contract matches the plans, and that the lender has accepted the draw schedule. If a mismatch appears after settlement, it can be harder and more expensive to fix.
Trusti Lending helps self-employed Melbourne buyers line up the finance, the contract and the draw schedule before they commit to a renovation project. Call one of our team or book an appointment at a time that works for you through our call back request page.
Frequently Asked Questions
Can a construction loan be used for a renovation project?
It can when the work is substantial enough to need a building contract, plans and council approval where required. Each lender sets its own rules on which projects qualify.
Do I pay interest on the whole construction loan from the start?
Interest during the build is usually charged on the amount drawn, so repayments grow as funds are released. Repayment type and timing are set by each lender, so confirm them in writing.
What is the maximum builder deposit in Victoria?
Under the Domestic Building Contracts Act 1995 (Vic), the deposit cannot be more than 5 per cent for contracts of $20,000 or more. Consumer Affairs Victoria advises waiting for the certificate of currency before paying it.
Does being self-employed affect a construction loan application?
Lenders look closely at income evidence, and what they request varies. Banks regulated by APRA must also test repayments at a rate at least 3.0 percentage points above the loan rate.